      Artificial Intelligence Notice: ISA prohibits the entry of any ISA intellectual property (¡°ISA IP¡±), including standards, publications, training or other materials into any form of Artificial Intelligence (AI) tools, such as ChatGPT. Additionally, creating derivatives of ISA IP using AI is also prohibited without express written permission from ISA¡¯s CEO. In the case of such use, ISA will suspend a licensee¡¯s access to ISA IP, and further legal action will be considered. Please review ISA's policies for Use of AI Tools, Intellectual Property and Terms and Conditions for further information.

      Cybersecurity Awareness Month Sale: This October, save 300 USD on select ISA cyber training and 10% on select cyber standards during Cybersecurity Awareness Month. View the deals.

      • By Sunny Desai
      • March 31, 2016
      • System Integration
      Cracker plant DCS upgrade
      More stress on planning reduces stress during execution

      By Sunny R. Desai

      A plant manufacturing a wide range of polymers, polyesters, fiber intermediates, and petrochemicals needed to determine the best way to update the industrial automation system. The complex commissioned a naphtha cracker plant in 1997 using what was then state-of-the-art technology, including a UNIX-based control system.

      Over the years, there had been a progression of vendors developing new systems based on the latest technological platforms and then declaring their older systems obsolete. Many of the components of the UNIX-based control system had been declared obsolete, and the vendor had withdrawn active support, spares, and engineering resources. There was a decreasing availability of spares, which were very expensive.

      The distributed control system (DCS) is critical for plant operation; the obsolescence and unavailability of spares directly affected the availability of the system for plant operation. Because electronic components degrade over time, the failure rates of components was increasing. All these factors increased the time and effort to restore a failure.

      Evaluation philosophy

      The company’s evaluation philosophy for developing an upgrade plan was based on the following major criteria:

      • Plant safety and reliability were of prime importance.
      • Efforts should be made to prolong or stretch the system life as long as possible without compromising safety or plant reliability.
      • If the reliability of the existing system could be enhanced with a partial upgrade, it was preferred.
      • If the partial upgrade of the system was not possible or did not improve the reliability of the system, efforts should be made to keep the full upgrade cost to a minimum.

      Evaluation

      A partial system upgrade was not suggested, because it would only improve the visualization, but not the reliability, of controllers, I/O modules, and other hardware components. Also, keeping in mind the remaining installed base at the site, other plants would benefit from the spares generated by removing hardware from this plant. The final recommendation was a full cracker plant control system upgrade.

      Project scope

      The following table shows an inventory of the existing DCS hardware.

      Sr. No. Unit Quantity
      1 Marshaling panels 111
      2 System panels 20
      3 Total I/O 14,000
      4 Alarm consoles 10
      5 DCS servers 11
      6 Operator stations 18

      Update considerations

      In the initial stage of the project, it was decided that the new system should be similar to the existing system in terms of the visualization, faceplates, and programming to avoid confusion between an actual problem in the field and a programming error.

      The technical requirements the plant considered during the engineering stage included:

      • time scheduling for minimum downtime during plant shutdown
      • interfacing to existing field instruments
      • reliability and safety of process areas
      • redundancy features
      • creating fresh logics in the new system from the existing system
      • converting proportional, integral, derivative (PID) tuning parameters from the existing system
      • graphical design similar to the existing system for ease of operation
      • communication with third-party systems
      • advanced process control (APC) program modification
      • third-party historian program modification
      • secured network architecture

      Method followed

      Time scheduling was the biggest challenge for the entire team, with a very limited number of days for executing the job, which included removing and fitting new system panels, removing all the components from the marshalling panels, removing and fitting new alarm consoles, formatting and installing DCS servers, replacing old operator stations with new ones, removing existing control network cables and laying new ones, and replacing all the power circuit breakers.

      The upgrade was to be performed in the short duration of a shutdown. To restrict the cost, the team decided not to replace the I/O panels, but only the internal components. This would also minimize the carbon footprint of this project. It would take a lot of time to remove and fix components individually, so the team decided to mount components on a plate and install the plate in the panels. All the components, such as I/O modules, communication modules, barriers, terminal blocks, and power supplies, were installed on the plate at the vendor’s factory, and factory acceptance testing (FAT) was performed on the same setup.

      To meet the desired system reliability, redundant controllers, communication modules, and some analog output cards, power supplies, and diode ORings (creating logical OR relationships) were connected in cross redundancy to avoid a single-point failure of any device in the distribution. Power supply units were only loaded at less than 35 percent of capacity.

      The software function blocks did not have the functionality of the old system, so many customized blocks were created in the new system, including blocks for APC and digital loops. A team of specialized engineers, including process personnel, tested the logic in the new system. This team visited the vendor a couple of times before conducting the FAT to ensure that the logic worked per the existing control and automation philosophy.

      The project’s new controller supported a significantly larger number of I/O than the existing controllers. The plant preferred not to merge the I/O in one controller, but had them distributed in the controllers exactly following the existing philosophy. No controllers were designed to have third-party communication and I/O communication together.

      It was decided in the design basis that all electronic components and cards should comply with the ANSI/ISA-71.04-2013, G3 classification. The installed components must operate for a minimum of 48 hours under extreme conditions: temperature at 0–50°C; relative humidity at 10–96 percent at 32°C noncondensing; maximum vibration at 0.2 G, 20–300 Hz; maximum displacement at 0.01 inches; 5–20 Hz. Considering the constant improvements performed in the plant during normal plant operations, it was decided to restrict the controller load to less than 40 percent, network load to less than 50 percent, free memory to greater than 50 percent, and power supply load to less than 40 percent.

      Considering the failures of the power supply and diode ORing across the site, a redundant power supply with a redundant diode ORing scheme was used for this project. An active diode ORing with a load-sharing indication and alarm relay was also used.

      Exhaustive FAT and SAT procedures were developed, and 100 percent loop testing and redundancy testing of controllers, power supplies, I/O modules, communication networks, and servers were performed. The team also performed 100 percent graphic testing and alarm simulation. All the closed loops were checked and 100 percent APC functioning and OPC communication was tested. During the SAT, the Profibus signature was taken for all the nodes and was preserved for future reference.

      Consequences and mitigation plan

      Following are the key risks involved in the project:

      Accurate as-built information unavailable

      Consequence: If the information available is not accurate, panel wiring and closed-loop operation in the field will be affected. Also, several instruments in the field may remain left out, affecting the complete plant operation and causing a delay in the startup of the plant.

      Mitigation plan: To provide an accurate project design basis, several walk-downs and manual surveys were performed to verify existing documentation was accurate. This activity was performed while the plant was running and did not affect the plant operation. The team took several photographs of the existing wiring in the panels, noted the color code of every field cable, noted every termination where they found a discrepancy with the existing drawing, and prepared a detailed file consisting of all the information collected. This file was the key to the successful implementation of this project.

      Manually converting the program to the new system

      Consequence: If the program built in the system is not accurate per the old program, it will affect the entire plant operation. The running process may trip many times, causing safety concerns in the plant and a financial loss.

      Mitigation plan: The only trusted document available for the programming was the existing program running in the old system. First, it was important to understand the difference between the logic block functions of the old system and that of the new system. The team listed the functional differences between the two, and modified the new blocks to function according to the old blocks. They decided to include the experts in the old system, from the vendor as well as the user side, in the engineering team of the new system. This was one of the crucial moves for ensuring a smooth upgrade. Several weeks were spent on this activity. Once the compatible logic blocks were built in the new system, a trial test was performed to check the operation of the blocks. On finding the operation satisfactory, clearance was given to the vendor to continue building the program. At this point, the team calculated the optimistic and the pessimistic time to complete the project execution, and all worked wholeheartedly to meet the deadline.

      Building visualization in the new system

      Consequence: If the conversion is not proper, plant operation will be affected, as operators will not be able to take quick actions when required. Because graphics are the main interface between the operation team and the new system, faults in the graphics will directly affect the operation team’s acceptance of the new system.

      Mitigation plan: The panel operators were used to the old visualization, so it was decided that the visualization in the system should be a look-alike of the old system, and the latest visualization features should not be used in this upgrade. This would help the operators accept the new system and also avoid confusion between actual problems in the field and improper mapping of tags in the graphics during the plant startup. Once the visualization was built in the new system, the engineering team performed a test. This test included verifying the sketches on the graphics and mapping tags to the graphic element, alarm window, trend window, group graphic windows, group trend window, and faceplate functioning. Once this test was approved, the vendor was permitted to build more graphics.

      Converting the PID tuning parameters

      A PID controller is a control-loop feedback mechanism commonly used in industrial control systems. A PID controller continuously calculates an “error value” as the difference between a measured process variable and a desired set point. The tuning parameter directly influences the accuracy of the control loop, and thereby the quality of the product. The value of these parameters can only be fixed during the running plant operation. These values are a critical asset for the plant, as they are fixed by the years of experience in operating the plant.

      Consequence: Steady-state operation of the plant will be affected, with a direct influence on the quality of the product.

      Mitigation plan: The vendor had developed a mathematical equation and a tool for converting the tuning parameters from the old system to the new system. The vendor had verified this tool at a different conversion project where the company was satisfied by the results of the conversion, and hence it was readily accepted in this project. Later the team found the results of this tool were quite accurate.

      Third-party communication

      Online analyzers, machine-condition monitoring systems, turbine-governing systems, antisurge systems, and plant emergency shutdown systems are standalone systems critical for plant operation. They maintain the quality of the product, control the safe operations of compressors, and maintain the efficiency of the compressors and safe operation of the plant. The readings of these systems must be continuously available for the operators. The communication between the DCS and these systems is done with a Modbus protocol, which is tricky and time consuming to configure.

      Consequence: This will have an impact during the plant startup when operators will not be able to see some data from the online analyzers, machine vibration conditions, and data from the emergency shutdown system of the plant. This will also affect the steady-state operation of the plant.

      Mitigation plan: It was possible to complete this activity during the preshutdown period of the project. The team arranged a spare controller and developed a test setup where the running third-party system communicated with the new system. All the wiring diagrams, communication settings, and response times were noted and later were directly implemented in the new system. This way it became quite easy to establish the communication with the actual new system.

      Removing old components and fitting new ones in the panel

      Consequence: If this activity is not completed in the planned time period, it will affect the entire startup of the plant.

      Mitigation plan: All the cables in the panels were not to be cut and removed immediately. Multicore cables from the field and power cables from the main control board cabinet were to be retained, so it was not easy to execute the system changeover during the shutdown period. To meet this challenge, several drawings were prepared for each panel indicating which cables and ducts were to be cut and removed and which cables were to be retained, where the ferrules were to be changed, where the lugs were to be replaced, and TBs were marked where there was interpanel wiring. Markings to distinguish between removal and retention were done in each panel. All the electricians were trained to thoroughly understand the drawing. To test the amount of time it would take to remove and fix the components in the panel, a mock operation was performed during the FAT. For this, a fully loaded spare panel was shifted from the site to the FAT area. During the mock operation, the team noted the time required, all the challenges faced, and the tools required, and they planned improvements. This activity helped a lot during the actual execution of replacing the components in each panel.

      Building secured network architecture

      Newer control systems are highly network based and use common standards for communication protocols. Many controllers are Internet Protocol addressable. Standard operating systems, such as Windows, are increasingly used in industrial control systems, which are now typically connected to remote controllers via private networks. The ability to access the system as a result of this interoperability exposes network assets to infiltration and subsequent manipulation of sensitive operations. Furthermore, increasingly sophisticated cyberattack tools can exploit vulnerabilities in commercial off-the-shelf system components, communication methods, and common operating systems found in modern control systems.

      Consequences: This affects the safety of the plant and can have a financial implication on failure. This may affect the entire business operation and can also have a social impact.

      Mitigation plan: Considering the current scenario around the world and the constant increase in the cyberthreat, the team decided on a secured network architecture with twin firewalls installed in the system. They preferred that the two firewalls were of different makes. This would help minimize any network-related threats. Antivirus software was installed in each system, making sure it was set to run the latest definition files. All the USB ports, CD/DVD drives, the autorun feature of Windows, the Windows scheduler, the remote desktop feature, and all the spare network ports were disabled. The auto log-off feature was enabled. These steps help prevent any virus attack on the system.

      APC implementation

      Consequences: Steady-state operation of the plant will be affected, minimizing the efficiency of the process and having a direct financial effect.

      Mitigation plan: APC implementation was a challenge in itself, because the new system did not have similar functionality to the old system. All the programing blocks of the old system were studied in detail, and blocks were developed in the system with the same functionality. APC will communicate with the new system via a dedicated OPC station. In the old system, the OPC wrote in a data block, but these data blocks were not available in the new system. To meet this requirement, thousands of tags were created, which will not use the license. The communication between the APC and these tags via OPC was tested during the FAT. All the programs for taking a loop in APC and removing a loop from APC were tested during the FAT period. The team performed 100 percent testing. Many data types required by APC that were supported by the old system and were not supported by the new system were found during the FAT. These data types were created in the new system and were mapped in the APC program. APC communication was established during the shutdown period, but the APC program in the APC controllers was modified in the post-shutdown period. Earlier, in the UNIX-based system, a separate PC provided operator interface to the APC. In the new system, a link to an Internet browser was provided for the operator to have the APC interface in the DCS screen itself, so a separate PC was not required. Once the plant was started, the APC program was tested for one of the furnaces, and in a week all the other APC programs were modified. Similar modifications were also done in a real-time optimizer and third-party historian.

      Technological improvements

      With this upgrade, we added some of modern automation’s state-of-the-art technology. Some of the noticeable improvements were:

      • Secured network: The new system network was based on the demilitarized zone (DMZ) architecture implemented using a twin firewall configuration. One firewall isolates the enterprise network from the plant network, and another firewall isolates the plant network from the control network, thereby creating a secured DMZ network. Both the firewalls are of a different make and can only be configured using a standalone configuration laptop.
      • Enhanced diagnostic features: Diagnostic logs are generated for each module, with master/slave in the hardware topology; they can be saved and analyzed for root-cause analysis and preventive maintenance. A Web-based diagnostic portal, where we can view warnings and controller errors, communication modules, and slave modules, is available in the system.
      • Smart client: This smart client is a true thin-client office workplace that seamlessly retrieves data from the system and connected third-party systems. The smart client is a dashboard visualization application that provides a read-only view into the system and allows the user to call up graphics.
      • Redundancy at the I/O level: For certain super-critical output tags that affect the production and safety of the entire plant, we have installed redundant analog output cards. During the normal course of operation, the cards share current demand from the field devices. Each card is capable of supplying the full demand current from the field devices. When one card fails, the other identifies the need of current in the circuit and supplies the full current.
      • Twin active diode-ORing scheme: Dual ORs with a load-sharing indicator are used in this project, which helps us monitor the load sharing between the two power supplies. This gives us an opportunity to identify a probable failure. Along with a redundant power supply, we have also installed a redundant diode ORing.

      Results

      Proper planning and coordination with the vendor resulted in an efficient installation and commissioning of the new system. All the 14,000 I/O, marshalling panels, system panels, alarm consoles, servers, and operator stations were successfully replaced in a very limited time. It is a success story for the entire team; we completed the project well within the planned period. The project can be summarized with the statement: more stress on planning reduces stress during execution.

      Reader Feedback


      We want to hear from you! Please send us your comments and questions about this topic to InTechmagazine@isa.org.



      Like This Article?

      Subscribe Now!

      About The Authors


      Sunny R. Desai has an engineering degree specializing in instrumentation and control. Desai is currently an engineer in the DCS/PLC/SCADA department, Central Engineering Service, at Reliance Industries Ltd.

      More than that, he deduced, the man had vanished and yet, after he was gone, there had come that unexpected descent of the rolling door which had first made them think themselves trapped. Sandy argued, and with good common sense, that a ghost, in broad sunny daylight, was a silly way to account for the man. He also felt that it was equally unjust to credit the drop of the door to gravity. Friction drums are not designed to allow the ropes on them to slip, especially if there is no jolt or jar to shake them. Walpole, however, continued to oppose the South Sea Bill in the Commons, declaring that the terms were too extravagant ever to be fulfilled; that the experiment could result in nothing but a fearful increase of the costs of stockjobbing, and final confusion and ruin. He insisted that, before the proposals of the Company were accepted,[47] the rise of their stock should be limited, and every means taken to prevent the fever of infatuation that would ensue from the promise of dividends out of funds which could never be realised. He proposed for this purpose the introduction of a clause fixing the number of years' purchase to be granted to the annuitants of the South Sea Company; but to this it was objected that it was the interest of the Company to take up the annuities; and, as the annuitants had the power of coming in or not, as they pleased, the Company would, of course, offer advantageous terms, and, therefore, the whole affair might be safely left to private adjustment. Aislabie added that the South Sea Company would not submit to be controlled in an undertaking they were to pay so dear for. The Bill passed both Houses. As the woollen manufactures of Ireland had received a check from the selfishness of the English manufacturers, it was sought to compensate the Protestants of Ulster by encouraging the linen manufacture there, which the English did not value so much as their woollen. A Board was established in Dublin in 1711, and one also in Scotland in 1727, for the purpose of superintending the trade, and bounties and premiums on exportation were offered. In these favourable circumstances the trade rapidly grew, both in Ireland and Scotland. In 1750 seven and a half million yards of linen were annually woven in Scotland alone. "Pardon me, Lieutenant¡ªI should perhaps say Captain"¡ªinterrupted Lieut. Bowersox, with much sweetness of manner, "but the most of us are familiar with your views as to the inferiority of the discipline of the Western Armies to that of the Army of the Potomac and European armies, so that we need not take up the' time of the court with its reiteration. What farther happened?" "Sure," Dodd said. "But I mean people. And you want the same things we do. You want a little comfort out of life, a little security¡ªsome food, say, and enough food for tomorrow. Right?" "Why, two shillings is too much fur farm-folks lik us to give fur a pound of chocolate. It's naun but a treat, and we can do wudout it." At last they came to Castweasel¡ªthree old cottages and a ruined one, leaning together in a hollow like mushrooms. Beside the ruined cottage a tree-trunk was lying, and Rose suddenly stretched herself with a little sigh. "I'm sorry," he said sheepishly. Rate, skate, and crabs. Farewell, farewell, you jolly young girls! HoMEɧµÄ»¤Ê¿ÃÃÃà ENTER NUMBET 0017
      www.yasuu.com.cn
      xudu9.com.cn
      www.wenhua8.com.cn
      mclz.net.cn
      yuqin8.com.cn
      www.guina3.com.cn
      www.regai4.com.cn
      alphatrend.com.cn
      01slv.com.cn
      98webfind.com.cn
      yihdao WWW_ANQULA_COM_HHH_COM 狠狠干我的骚穴 性爱图片狠狠干 日本美奴操逼 制服诱惑五月四房间 大姨妈小穴图片 性奴志愿 WWW.HHH10.COM WWW.VIE5.COM WWW.FUN48.COM WWW.BDY4.COM WWW.HNDEYOU.COM WWW.CLNHSN.COM WWW.91P05.SPACE WWW.AAA773.COM WWW.CPILW.COM WWW.XYYWS.COM WWW.ZGCCCY.COM WWW.GHSXN.COM WWW.51569.COM WWW.690088.COM WWW.465E.COM WWW.YIBODO.COM WWW.52SE52SE.COM WWW.WWWAVAVYY.COM WWW.23U.COM WWW.9PED.COM WWW.AVTTMM.COM WWW.NIUA.COM WWW.JQZXZX.COM WWW.CCC460.COM WWW.A1069.COM WWW.XTUAN.COM WWW.2OE5.COM WWW.DM123.CN WWW.CNULINK.COM AV搞视频 好好日天天干 浪漫的黄片下载 secc321 美国a片啪啪 gg523com 55p3com 初尝禁果的文章 制服丝袜最新在线视频 1122stccm 搜索俺为美女脱衣舞 6yykk 天天色撸撸色 乱伦小姨子自拍 免费在线A级黄色视频onxjhesxcn 能看调教图片的网站 小明看看46 电车痴汉强奸AV学生 韩日毛片一亚洲av 50p被干美女 rengyushouhuqngpian 十方哥在线视频播放 激情亚洲偷拍自拍图 亚洲1页色 电子书A片 手机超碰在线观看 91视频AV 爱涩影院 www85TTPW 天天拍天天操天天撸 人曾交长片 哥哥个干 好色教育实习生 骚女巨乳 少妇美tt2222 久久强奸哭 盗摄系列百度 无码射射色图片 大爷操作影院388sesecom 色在线视频综合影院百度 豆豆rrcom 涩涩亚洲区百度 连裤袜性交视频 成人老婆在线性爱视频 撸一撸亚洲色图 影音先锋AV库 午夜黄色视频播放 www567net最新网站 大香蕉中文字幕强奸乱伦 强奸乱轮9 激情自拍色图 久久热哥哥 03ffffcom 成人电影wwwhhh712com 求个黄色网站 www710tt 妹子的屁眼图片大全 赌场另类 sm虐乳另类小说 丁香成人四房色 插插快播电影 偷拍AV东方视频 美女裸体性爱片 妹妹的骚穴thunderftp 偷拍自拍图magnet 帮撸撸网站 清秀女上下其口 给表姐调教成性奴 www4h567com 在线男人福利 AVPP6SCOM 东方Av偷 免费33qqrrcom日本 欧美天天更新 插最色妹妹人体 范冰冰性交视频下载 大色网小色网女色网 国产小姨子下载 swwwavav50comhtmindexhtn 亚洲伦理在线无码电影 56P视频在线观看 69俄罗斯美女视频 儿子强奸穿旗袍的母亲 小学女生洗澡自慰视频 人体艺术导航幼女 春暖花开 caoliushequ 苍井空电影小说在线 色 情激情 和楔在教室做爱故事 兽兽门色图 暴力虐待性奴隶小说 oumeixingaihenhenluo 五月天色色护士 日本激情无码电影网址 迅雷可以下载的黄色网站是什么 干老骚逼影院 性福写真 爰尚小说网 幼交21先锋影音 馒头屄夹大阴茎 wohewodefengsaoxiaoyima 美女颜射左爱肛交p 欧美bb艺术照 女子屄大的秘密 肥女人体艺照 欧美色图 迅雷下载 人体艺术147oma 信哥猛男和黑丝边小姨子性爱老婆在旁装睡 舒淇的屄 大吊成人社区电影 影音先锋东京热黑人 操肿了少妇小穴 和亲姐添阴道 mm的阴道图片 张靓颖人体艺术视频 看看大胸美女大逼 早川濑里奈亚洲色图 娜娜 大胆人体艺术 renyudongwvxingganpian 狠狠操深夜操逼逼逼 白皙亚裔女大战老外 laonian性爱重口味 名模人体艺说 大唐营养师 为什么我下载完快播看不了黄色 在哪能看韩国女主播 国产老太太色 幼女变态性交视频 成人视频哪里有卖 我和大胸骚老师做爱了 wwwhbhb55cm 痴女种子 先锋阴影开心激情五月天 第五色宗 迷奸欧美荡妇熟女黄色电影专区 激情五月丁香妹妹 外国3级片在线观看 插入乳房小说 超诱惑美女祼体艺术人体 在线电影亚洲偷自拍 韩国女主播奶 黑人与美眉的淫图 玲花的艳照 优酷少妇人体艺术 欧美家庭性生活 爆插女优色 国产三级偷拍 撸撸淫色图吧 佐藤爱理番号 弟弟舔姐姐的乳头 大鸡巴插嫩逼 亚洲成人在线夜撸憎无玛视频 宅腐萌基动漫社精灵梦 yy6029淫影院 生精汤生蚝 百度影音孕妇系列 偷拍自拍亚洲古典乱伦欧美在线 哥哥操网正在播放双拳交女朋友如何自慰 灰灰色色资源站 桃花阁综合图片 日日啪在线视 变性人精液洗澡AV网址 百度影音幼幼 日韩萝莉AV网址 亚洲激情视频m67wrcom 插吧插吧网文学 色色人马大战 wwwAY7scom 李昕岳的阴性 父女性交小说 HAOSESAOZI pan写真无插件 天堂岛成人网 全裸漏淫 色色干内射 wwwav7scom为什么进不去了 橘子色网 久草热这里只有精品网 战争的黄色小说网站 wwwdiyesao 堕落家族 呆哥哥草美女 www吉油二中 开心五月天三级电影 www开心五月天.com 东京热系列图片 五月 下载看黄片 有没有什么黄色小说 黄色小说哪有 淫色影院 いの同性愛 写真和动漫 艳门照全集 淫逼逼社区 色小姨子爽图 性乐汇色高清 后羿射日 农夫色 得得撸改名得得爱 亚洲AV怡红院 WWWXXⅩCNCm 色色色色大杳 av69电影 2019午夜AV 除了尤酷播 jahd国产 91成人网 操破苍芎 美国胖老太太一级片 国产学生爱爱在线播放 借贷宝苍井空视频 1丁香五月婷婷综合缴情 茄子视频官方在线 全岛免费视频在线 青春草青春草原在线视频mnp4 清清偷拍视频在线观看 求一个免费看成人直播的网站 影音先锋工作的女人38 日本一级乇片无码下载 日本男人乱伦 影音先锋 muso 4d私人影院在线播放 瞒着刚出门不到2秒的老爸,两人相奸 自偷自拍福利在线 日韩店长推荐中文字幕 肉视频资源 午夜剧场614男人天堂 极品色院吧 黄片平台 xxooo168 aiav页面访问升级 51成人电影 52XX少妇视频 绝品尤物!女神级别超美妞,疯狂3P现场,淫荡满屋! 李宗瑞迷奸视 频 午夜福利 在线观看变态另类第一页 一级A片另类 青娱乐视频极品视觉盛宴 自拍 偷拍 日韩 熟女 美女裸直播下载免费 榴显影院 vod偷拍无码 adn071在线观看 色女孩影视最新网址 bkfuli影院 校园春色 福利社 日本avrct系列迅雷下载 桔子av成人在线 东方在线Va观看 福利视频在线导航 福利所 369 电梯 爱情 番号 yuoijzz日本在线播放 福利电影免费资源分享 超碰在线播放 欧洲人妻种子迅雷下载 8X成人永久在线 自拍偷拍 p 苹果啪啪视频在线观看 av在线香蕉 神秘的女大学生真人漫画 女生找不到黄色网站 闫凤娇全套无码magnet xo色视频 最新番号在线播放 桃花岛福利影院 女人自慰视频在线观看 邪恶爱爱视频 非洲人哆啪啪免费视频 石榴影院a先锋 破初系列在线观看网站 七色成人网址无效 五月丁香视频频 在线波波影院 韩国 pornxxjav 大陆高清自拍MP4 武汉第七中学门国产自拍在线 juy586免费观看 丝袜啪啪啪在线视频 磁力链 下载美胸 看欧美操b片 日本无码动漫网 国产精品 偷拍自拍 强奸 xxxbv视频 调教老师做爱视频 XXX日本老太酒店性爱视频 另类图片五月婷婷 人人看人人搞人人摸888excom av无修番号 xfplay天海翼 协和 白石茉莉奈 star-843 斑马屋电影艺术 丁香五月情大香蕉 738ii网址 大哥电影x网 北条麻妃脱粪 fc2 夫妻酒店找单男 日本老影院 小野寺梨纱西瓜视频 哑巴虎影院 小护士潮吹视频 日日影院免费 xiaojiejie nnpp66 佐佐木明希AV资源在线 avaoao 超碰视频成人视频国语对百度翻译 m8aeiy03gb色视频在线 冯堤莫的黄片 催乳成人福利视频在线观看 喵喵影院试看 国产XO在线 喵咪网址 天堂av李宗瑞 金艺贞百度网盘 国产自拍乱伦 操逼视频免费老死机影院 过年重磅福利第2弹好大的鸡巴女神思瑞被好多胸毛的大款各种姿势草无套内射呻吟刺 东方在线a最新域名 4438爱色 窝窝色资源共享 色姑娘2017一本道 pppd-328中文字幕迅雷下载 死侍2在线观看莉莉影院 色猫最新 激情片试看60秒 97波波影院 vidz老湿影院 不卡的高清无码dg vod手机免费视频在线最新 草 比克—让看片更简单 sm男虐女地下室调教视频在线 波多野结衣在线视频hn ug网女人自慰视频 国产内射射精 射逼tv 大尺度激情直插下身视频免费 vv98aa +21sexvideo 日本在线乱伦 微福利日本生活片 日本女学生在野外XVIDEOS 小清新影视播放器av 在线视频 blowjob 甘婷婷种子磁力搜索 汤姆影院大香蕉 细川蓝连接 全世界最火的小黄片视频网站 美的冒泡的亚裔大战外国 高老庄影院在线视频 先锋资源你懂 北度影院 被窝影视停止运行 肏性感丝袜美腿女教师在线视频观看 大奶美女做爱av 视频 偷拍种子 猫咪av大香蕉最新网站 富二代福利在线 久久影院扶摇 国内自拍激情免费 乱伦免费观看网站 今天的良吉同学全集 气质美女经理酒醉被上司带宾馆各种玩操自拍流出 青青草嫖娼视频 强吻小视频软件不用下载在线观看 里番极影吧 熟女人妻系列 日本十八禁私人影院 110黄色电影 精品国产自在线拍400部 狠狠天天曰天天日 狐狸hense 黑人巨大vs村上凉子 老师用自己身子奖励小俊 日本狭窄试衣间系列在线观看 rd845影音先锋 自拍在线亚洲超碰 3j64cn 爆乳在线 首页—宅男 av淘宝首页 最大热情网站4438 weiniangnvyou wwwavtt96 998自拍视频在线观看 国模欢欢视频在线播放 国外裸体人妖图片 winktv荷恩视频在线 操逼片视频高清 92acg 肛交在线免费视频 影音先锋磁力链接厕所偷拍视频无码 YY6080做爱视频 美女老师后入gif 米娅卡莉法 ftp av隔壁老王每日更新在线 猫色成人社区视频 香蕉XO 18岁以下禁止观看的偷情视频 久草在视线免费视频首页 97人妻巨乳网 成人露露小说 名字里有月的小说 美女阁的裸体美女 先锋电影欧美 meinu52 97色哥妹 白俄罗斯大胆美女人体艺术 乱淫姐姐淫荡妹妹 WWW_YELLOW_COM 欧美第1页苍井空 牛莉最新电视剧 樱理惠百度影音 一级黄色中文 人与动物兽交第一页 少女叉腿的桅 偷拍吸乳 大崎京子 韩国美女吃鸡巴图片 喜欢人妻八别人干 www1xpxp 迅雷网好色妻将临 妈妈给儿子操乱伦小说 ajsetang 14部韩国三级剪辑 bt 逼图自拍大全 逼痒找操 人妻凌辱 快播网 三级片图片乱伦小说 超级护士美女做爱 日本小女孩幼交网站 最胆大的欧美裸体艺术图片落逼 大黄狗与美女交成人 快播 WWW_DYTV_COM 按摩成人电影 先锋成人激情电影导航 快播7777av WWW_56ZY_INFO 冰冰色网 外国女人为什么没有黑木耳 苍井空什么网站 偷拍自拍草裙社区 3p换妻肏逼 SAOLAOSHI 巨乳妈妈快播 早川奈里濑影音先锋 中年妇女性爱自拍 国产情侣自拍种子磁力链接 WWW_MEINVZC_COM 暴风影音乱伦小说 后庭教程 美女流水图片 直径8厘米阴茎操屄 成人性爱自拍偷拍在线视频录像 西西大胆人体艺术黑木耳 淫荡妈妈bt下载 中国18岁大胆人体艺术 松岛菜菜子 上海浦东注册公司 自体脂肪移植多少钱 上海大众老总 陕西煤业化工集团 美女脱衣操逼图片 老淫妇 烘晕 成人网人体艺术usa123456 亚洲摄影艺术人体 与丈母娘在沙滩 亚洲无码自拍小说 huaheshang综合 成仁视屏免费 激情小说处女视频 免费电视连续剧金瓶梅 女生殖器裸体实照片 日韩av影音先锋播放网址 60璐色图 曰本成人人体艺术 上海熟练援交12岁姐姐网盘 我和护士姐姐做爱的小说 猛插美女女骚骚逼图片 俄罗斯幼影音先锋 美女逼掰穴 豆豆色新网址 女妹比 色书成人网 时田爱梨写真视频 躶体谢东娜 类似ri44的网址 私人影院优惠券 汤芳真实图片 性交合人体艺 222xoxo电影 柳菁菁人体艺术图片珍藏版 美女逼逼露在外 漫画美少女做爱图 少年阿宾里面有一个叫小虹的是哪一章 丁五月wwwqqq94com 苍井空老师动作片视频 咪咪电影网91苍井空 百度一下插屁屁 WWWVDS888COM 白领刘艳露脸脱光全部展示在你面前 神枪手必备系列美人自慰54连发部部精神 和继母乱伦做爱蜜汁 打炮口活美女3g WWWXFZYINFO 加勒比黑木麻衣qvod 操逼内射电影mp4快播播放 3p插深 奇米骚屄 都去哪里下载毛片 873kk在线视频下载 处女素人娘 姥姥乱伦myouqubanet 成人电影网77855ssco影 校园春色插逼逼 日本av经典乱伦片 穿丁字裤的风骚少妇 被医生舔的好爽 强制灌肠亚洲欧美 电影区制服丝袜亚洲日韩欧美性爱 777meco 中国人体艺中国最大 东北大炕淫乱性生活 成年女子a 武侠古典被同学盯上的巨乳妈妈 超碰97久牛牛久视频在线观看视频 黑人艹白人美女 舅妈丝袜高跟鞋的诱惑 动漫恋足网站 1级寅色大片 俺去啦胖妞逼 高园园的足交图 发情老色鬼想女人找女人操屄摸大奶孑骚女人急摸龟头大鸡巴 偶偶撸AV在线视频 韩日三级片嫂孑 萝莉幼女黄色网站 日本大香蕉成人动漫3D 张筱雨大胆淫色 北原爱子番号 最新青楼社区网址 妈妈献身教我性交 韩晶好听的歌曲 伦理淫荡长篇小说 san色激情五月色五月 欧美亚洲国产港台A片 b8mpmp4下载 激情乱伦美腿丝袜自拍偷拍校园春色 日本少女AV大香蕉 风流情哥哥网站 润错网主页 17岁少女跪嫁68岁老汉 已婚少妇爱爱群的密码 少女淫穴露出 大嫂激情图片 图文秀色小说 淫妹妹做爱影院 黄色小说下载逍遥岛 亚洲成人色色图片网站 日本人体之亚州色图 波多野结衣逼器 老女乱小说 欧美美女西西外阴图 亚洲图片欧美激情网盘下载 色妹妹操逼视屏 色色的 美国发布Av网站大全 猛操表姐表妹 美腿裤袜在线 日日夜夜撸天天操 第四色夜夜射五月天 WWV111WeCOm 欧美色图就爱啪啪啪 popovodcom 婷婷色丁香迅雷下载 白色妈妈在线观看 东方av色bi在线观看 亲亲少妇嫩逼图 下载美女露阴部黄色免费片 日本内射少妇15p图片 卡戴珊影院 www77dvdinfo 超碰依依 o855视频 清纯欲女小说 幼女大波美女 插少妇菊花蕾 完整av网站 l校园春色另类 一本之道加勒比图片 国产ts先锋 色老二导航 av看了心痛 暴力虐待亚洲色图 成人电影美国 美味的工作经典三级WWWBBB660COM aa56788影院 丝袜黄色图片区 熟女美穴 yes44444 猛男干娘女图片 搜索口述口交 交换人妻自拍 成人啪啪啪看骚妇的小逼插的水汪汪高潮连连视频 亚洲色色图片区 javzoo新址 大奶妈妈的骚 倒立口交式图片 快播se333se最新地址 开放性直播间 217av天堂网 意淫强奸网站 狠狠撸狠狠靠 daselang150 我要在线视频 欧美无码色无极视频 980hh 影视软件论坛 拳入穴 乱伦无码西瓜 家庭乱伦3P 朋友媳妇的胸罩 素人娘初同性体验绝顶4时间在线播放-另类重口-狼人干综合 欧美爱爱色图 av女优巨尻代表作品 阿姨的小内裤 肛交肛门外翻 偷拍巨乳电影96uicom 91自拍za 色浪直播 人妻按摩乱伦 微信自慰视频mp4 老外黄色片 www sqwuyt com 外国少女强奸戏视频 张雨霏小说 69黑几把 宝安凤凰山森林有没有做服务femjoy少女 www3344xocom 摸逼视频 夫妻录的黄片啪啪的做爱有免费看的吗 朴妮麦的下面 吉吉影音日本乱伦片 全球好美女视频网站 欧美小女日 视频男同av电影 身穿民族服饰的中国少数民族漂亮美女大胆人体艺术7国内 xxx成人视频拳王女友 啊v天天啪 性爱秋千性漫画版 东京天堂AV2015 阿庆淫乱记 在线巨乳美女视频网站 国产成人线观看 色嫂嫂色护士影院 伦理三国tv 骚穴一本道 学生强奸同学母亲 欧美av聚合 骚妇淫叫声 超级碰成人在线视频删除 苍井谷人体艺术 哪来可以看韩国女主播完整视频 苍井空最好看的tv 月亮女孩人体 无马欧美 哥哥涩 搞逼bi 360乱伦熟女图 射进嫂子阴道 强奸美女到昏迷 妈妈看我肉棒梦精 亚洲成人肉图 无毛幼女潮吹 女人与老头做爱 日本av电影bt哪里下 超碰强奸 双性幼交 欧美大乳裸体性交图片 我干美女老师做爱 亚洲狠狠鲁色姐姐 外国美女口交20p 操大吧 袜 乱伦图区 另类图区 套图专区 美乳深沟 成人漫画 影视先锋 瘦瘦的中国男操东欧女 偷拍自拍综合套图 少妇宾馆阴毛中国明星被操逼 激情乱伦口述 gjg999 h公开插入 在线观看影音先锋2014色色色 黑人大战美女快播 铃木杏 cgx 肥熟老妇裸照 淘宝打不开 兰博基尼gallardo 翁美玲怎么死的 大瓷商主题曲 涩色快 欧美亚洲另类自拍 i444种子视频 胖姥姥性爱 偷拍美女衅 wwwxxx520com 被干得淫水潮喷山洪暴发中文字幕 首播影院西瓜 屄大阴门深 www色中色在线色com WWWSZYK10COM 囗述被强间 古装色图片区 18舔逼阴毛图片 www2424avccm 女性的阴性道在那 校园春色之公车上被轮干 93aad2e50003c933 高av小说 胖子操逼图 色妹妹图大黑逼 不卡成人在线视频 仓井老冰同 色爱偷拍女老师犯骚 和妈妈在火车上做边爱色 266成人电影ftp 狠狠撸最新版妞妞 美国十次啦1 av人体系艺人术 成人在线专区 台湾超碰人人肏 正在播放五十路母影音播放 日本美女奶子艺术照 松坂庆子快播无码在线观看 幼幼bt套图 妈妈再来一次波多野结衣快播 亚洲日本女同性恋mp4 成人小说乱 可乐操丝袜美腿骚少妇 95后美女自拍色 美女的裸体大胆图片 欧美在线视频三级wwwooxxbbcom 长时间丝足动态图 激烈抽插女教师下体 蕾丝袜美女嫩穴小说 大香蕉伊人在线观 人体艺术写真女姓生殖器 老王社区lw78cc 淫妻网狠狠干 漫画少女粉鲍 第二书包网站首页 成人在线视频逼最黑的 综合五月天图片专区 制度老师av 摸十一岁幼女 青青艹magnet 日日夜夜全色视频 和情人打炮自拍图片 裸带av网 操丝袜嫩b 艳照门照片漏b照片 大尺度性交电影 野春色 樱井莉亚179sky 小泽玛利亚经历 介绍h网 依依黄色小说 木下あずみ 老狼影视 黑寡妇导航 色色色视频 2011色色 皇家礼炮娱乐 性虎成人导航 37xxBB电影院 蜜桃95撸管天堂 五月连成人综合网 4438xoxoxo 天狼电影ing 小明看看永久局域首页免费 三级毛片国内开放 日日谷影院 亚洲瑟瑟吧 秋霞床上 秋霞午夜o855影院云播 清纯萌妹子KIKI magnet xt urn btih 性感皮裤高跟36D爆乳骚货情人性欲高涨 全网第一直播福利视频 亚州熟女被调教中年妇人撅起屁股 日韩亚洲元码天堂 玉蒲团网站会员多少钱 日本最变态的绑法视频 eeuss55 唐琪儿福利视频视频 色喇叭国产自拍 女地下党受刑奶头 诱惑自拍福利 香港女星被强奸 种子下载 爱爱无码骑姐姐免费视频 晚上看的网址小视频 强暴磁力 高清无码偷拍磁力链接 下载 凑点伦理电影网站 狠狠哥 麻生希未亡人手机在线观看 2q2002青苹果影院免费 性感美女丝袜舞曲 95年女孩车震在线视频 大萝卜男人福利 gav成人免 无尽的轮奷电影 大哥综合站 最新地址 少妇xXXx 激情网站地址 dy888 旅馆 caoprm 蝌蚪窝 sifangpian加速 9|成人影院 射奶 淫水 肏逼嗯嗯啊吧 朝鲜高清在线色视频 cartoon sex video 瑶瑶无圣光 AV 超碰 激情按摩胸部无码 免费网站视频深日 人人看人人爱人人妻 张丽丝袜高跟战黑人magnet 亚洲av欧美av电影av视频 福利视频合集10op 粉萌磁力链接 大胆gogo泰国 福利思思 年轻的岳毌2 99热rys影视精品 水果湾app 移动成人电影 xxxxxyounv 影音先锋主播勾引 国产精品自拍偷拍在线观看 雨芳恋歌 ftp 无码av,av毛片,日韩av 欧美AVmm625 jj插bb动态视屏 午夜av影院 手机版 欧美zz人与曾视频在线 一级黄自拍 朴秀娜 个人 资料 av女同性恋做爱视频 XXX日本老太酒店性爱视频 香港黄页之米雪在线 女性使用自熨器视频 成人影院怎么下载免费 av手拉在线 强奸类型的韩国三级片 最新母乳孕妇在线 日本100部禁片 a v共享 小黄片在线免费无码 性爱啪啪小视频 小野寺梨纱三级在线 小黄瓜插b漫画 一级爱做a片 大黑鸡吧的黄片 九哥高清超逼视频 邪恶少漫画大全439 花花公子影院 成人 快播 tom 国产无码自拍在线 国产偷拍女澡堂在线视频 黄在线aBc 爆乳保姆激情电影 国产自拍手机电影 色酒吧影院亚洲图片 波多野结衣网站 苍老师作品合集 无码 北野望2018在线未删 国产三级在线播放 草莓视频午夜国内在线视频 高颜值国产av 香港淫色 超碰游戏指南 卯月麻衣mp4 北条麻纪AV百度网盘 Free julia av 人人爱av 操b视频激烈视频 成人首发裸体褚场视频 宅男93福利视频 金巧巧 magnet xt urn btih 色戒网色老板 偷拍自拍高清韩国日本 黄片BiBi小岛 手机黄山网站在线播放 111lu在线 先锋影音av防屏蔽 毛片多多 波哥和好友暴力3P银行理财经理貌似把人家下面弄出血了高清无水印_ 波多结衣四虎影院 四虎 在线播放 亚洲17p第一页 799pao 午夜福利王梦溪无码照 开心色导 最新免费av 久久青青草视频在线观看 红桃出肛 gif 另类变态 国产艳舞团 中国国产毛片 要看大鸡巴操小骚逼的人的视频 居家少妇露脸18p 杉原璃裸体视频 激情动态姿势视频片段 寂寞男女视频自拍BB 饥渴少妇偷情视频 青青草免费视频在线观 拳脚周晓林在线播放 加勒比 japan 香港 娇俏特工免费版日本电影 都市激情校园人妻亚洲 免免福利视频 色狠居 水滴摄像头偷拍 李小璐娇喘 人猿泰山h版无删减mp4 噢门赌场啪啪啪视频 97影院在第一页 1024福利视频免 bastianhart在线 大屌哥高素质兼职在线观看 av2017 中文无码在线观看 9isex性网 游泳教练与学员伦理视频 小萝莉av视频 av无码电影网 国内淫妻 女人屄屄插进去图视频 男人插女人视频3d988 国内妇产科妇检视频盗摄下载 男人搞基女人视頻未滿十八岁不能看 男女啪视频四虎 男人插进女生比比里视频 好屌操穴 后入超高跟视频 在线看dvd一本道 一楼一凤影院 亚洲在线 三客优午夜伦理 涩涩导航 借贷宝150合集在线观看 亚洲成人网站 青青青手机频在线观看国产 姨丈不在干阿姨 汤芳无尺度人体艺术 至爱色色图 yy女主播热操逼 ss99c0m wwwbt778com 偷拍真人免费做爱 老婆的黑木15p 欧美性爱狠狠鲁狠狠射 欧美性爱360大奶网 日本色长图片 口交bt种子 图片区亚洲区小说区包玉婷